| Portable Accommodation
Units |
Elemental Breakdown
Per Unit:
|
Preliminaries overheads & profit |
$
|
|
Structural Steel |
$
|
|
Flooring |
$
|
|
Roof & wall cladding |
$
|
|
Louvre screen to deck |
$
|
|
Aluminium windows & doors |
$
|
|
Internal wall & door |
$
|
|
Floor finishes |
$
|
|
Sanitary fittings |
$
|
|
Plumbing |
$
|
|
Electrical |
$
|
|
Air conditioner |
$
|
|
Transportation & protection |
$
|
| Total Cost Per Unit (excl GST)
|
$
|
|
| Joinery Prices: |
|
| Extra over cost to provide the following
joinery items. These items are not to be included in the tender
sum or the total cost per unit. |
|
Desk |
$
|
|
Shelves over desk |
$
|
|
Shelf & drawer component of robe |
$
|
Hanging component of robe |
$
|
|
Ensuite vanity cupboard |
$
|
| Unit Costs: |
|
| Provide the unit cost for each item
listed below: |
|
Supply & fix 50mm wall panel |
$
m² |
|
Supply & fix 100mm wall panel |
$
m² |
|
Supply & fix 100mm roof panel |
$
m² |
Supply & fix wet area laminate
wall panelling |
$
m² |
| Each of the above items assumes
no cutting, folding, flashings, penetrations. |
|
Supply & lay sheet vinyl |
$
m² |
|
Glass shower screen & s/s post |
$
m² |
|
Supply only – shower base |
$
each |
|
Supply only – toilet & cistern |
$
each |
|
Supply only – vanity basin |
$
each |
|
Supply only – shower mixer & rose |
$
each |
|
Supply only – vanity tap |
$
each |
|
Supply only – light fittings |
$
unit |
| Additional Checklist |
|
| The tender programme to show all
of the following: |
|
All major design & supply activities |
|
|
All programme milestones |
|
|
Critical path |
|
|
Total float & free float on all activities & the critical
path |
| Preliminary Design Drawings |
|
|
Preliminary design drawings show the structural details |
|
Electronic “site plans” to be provided upon request
to Fielder Engineers |
| Type of Building Construction
|
|
The tenderer shall submit with his tender details of building
construction methods &
materials used for the construction
of the portable buildings |
| General Conditions
of Contract |
|
General Conditions of Contract are Australian Standard AS4300-1995 |
|
The law applicable is that of the State or Territory of |
|
Name of the Principal provided |
|
The address of the Principal |
|
Name of the Contractor |
|
The address of the contractor |
|
Name Superintendent |
|
The address of the Superintendent |
|
The date of practicable completion |
|
Preliminary design |
|
Itemised list of Principal’s Project requirements |
|
Limits of accuracy applying to quantities for which the Principal
accepted a rate or rates |
|
Contractor shall provide security in the amount of |
|
Principal shall provide security in the amount of |
|
Retention money shall be deducted progressively as follows |
The period of notice required of a party’s intention
to convert security into cash or to
have a recourse to security
or retention moneys |
The percentage to which the Principal’s entitlement
to security & retention moneys is
reduced |
|
The percentage to which the Contractor’s entitlement
of security is reduced |
|
Holding of & interest on cash security & retention
moneys – the alternative applying |
|
The number of copies of documents to be supplied by the Principal |
Documents, number of copies, & the time or design stages
at which they are to be
supplied by the contractor |
The time within which the Superintendent must give a direction
as to the suitability of
documents |
|
Work which cannot be subcontracted without approval |
Subcontractors or selected subcontractors whose contracts
the Principal may direct be
novated |
|
The percentage for profit & attendance |
|
Intellectual property rights granted to the Principal –
Alternative applying |
|
Legislative requirements not required to be satisfied by Contractor |
|
Insurance of the work under Contract – Alternative applying |
| If alternative One
applies |
|
(a) The amount for demolition & removal of debris |
|
(b) The amount for consultants’ fees |
|
(c) The value of materials or things to be supplied by the
Principal |
|
The additional amount or percentage |
|
Public liability policy of insurance – the alternative
applying |
If Alternative One applies the amount of the public liability
insurance shall not be
less than |
|
Amount of Contractor’s professional Indemnity Insurance
shall not be less than |
Amount of Contractor’s professional Indemnity insurance
shall be maintained after issue
of the Final Certificate
|
Period for which each Consultant’s professional Indemnity
insurance shall be maintained
after issue of the Final
Certificate |
|
The time by which access to the site shall be given |
|
The time for giving possession of the site to enable commencement
of further work |
The times by, or periods within which the superintendent is
to furnish information
materials, documents or
instruction to the contractor |
|
Events causing delay |
|
(a) Industry related conditions |
|
(b) Site & Contractor related conditions |
|
Inclement Weather |
|
Rate of liquidated damages |
|
Limit of liquidated damages |
|
Bonus for early practical completion |
|
Limit of Bonus |
|
Other events for which extra costs delay or disruption are
payable |
|
The Defects Liability Period |
The charge for overheads, administrative costs, site supervision,
establishment costs,
attendance & profit
for day work |
|
(a)Times under the Contract for payment claims |
| OR |
|
(b) Stages of the work under the Contract for payment claims |
Unfixed plant & materials for which payment claims may
be made before they are
incorporated in the works |
|
The rate of interest on overdue payments |
|
The delay in giving access to the site, which shall be substantial
breach |
The delay in giving possession of the site or sufficient of
the site which shall be a
substantial breach |
|
Further steps required before proceedings – the alternative
applying |
|
Nomination of an arbitrator – Institute of Arbitrators |
|
|
|